Friday, November 9, 2007

...meanwhile, the Pixie limps on...

I've been remiss in posting lately, and for good reason. Several good reasons, in fact: namely, I've been exhausted and achy. I've been so tired I didn't even post a happy birthday to my sister Miss Kitty on Thursday. It's been a rattling week, what with some drama at MHRC and general ankle pain and stiffness. This ankle thing has slowed me down to what feels like a glacial speed. If I forget something in the office or house after I'm in my car, I can't just "run" back in and get it.

Today was my first day without crutches in almost three weeks. It's a double-edged sword, like most things. I'm a little slower without my crutches, but at least I can carry things as I perambulate. However, the gel brace my doctor gave me to wear hides under my pants, meaning that no one can overtly see why I'm limping. With crutches, I'm the injured girl you feel a little sorry for and sympathize with. You'll hold open doors for her, ask her how she did it, compliment her on how fast she's getting around with those crutches. Without the crutches, I'm the handicapped girl who's struggling along and kind of weird. You won't make eye contact with her, and that door you used to hold open falls shut because you don't want to catch whatever makes her a little slow, a little limpy. It's startling.

There's plenty going on in the architectural world for me to comment on; I'll blog later on them. I'm still pretty damn tired.

Sunday, November 4, 2007

Wave your foot in the air and party lazy like you just don't care

The day was spent with foot on pillow, and a good time was had by most. I fell asleep while reading a book Dame Judith loaned me, only to have sleep snatched from me by the roving pack of yowling hunger-beasts known as Maddy and Hazel. Have they no shame? I mean, really. I'm all laid up here, and these two want crunchy treats. Fortunately, Papa Guy stepped up to the plate and chucked treats at said kittehs. Then he cooked dinner and even brought me my plate. Awwwwww.

Today will be more of the same--much laying around with foot in air on pillows, perhaps even some ice on the ankle. Guy and I noticed last night that my left leg is looking larger than my right. In two short weeks, that right leg is atrophied from not walking around and getting some activity. Weird. Two weeks is all it takes, it seems. At least it's not in a cast, so I can shave the leg and paint the toenails, rendering them unawful to look at. While Guy's out getting groceries, I suppose this is a good a time as any to lay down and do some more nothing. (Though doing nothing makes it hard to go back to work and do stuff, I find. Makes me forget what I was doing there in the first place.)

Thursday, November 1, 2007

Worn slap out

Too tired to really say anything, y'all. Between limping and dragging myself around with crutches, I have less than zero energy. I'll post later this weekend when I've had some real rest. If anything, the past week and a half has revealed that, with an injury, I can't go at the same speed at which I go when both legs work.

Tuesday, October 30, 2007

Crutchwatch '07: two steps forward and one step back (and a lesson on contractors)

I apologize for the lack of posts lately. I generally don't feel like being on the computer when I get home after staring at one all day, and that feeling compounds when Guy is gone for part of the week and I'd rather hang out with him than do anything online. The feeling then multiplies when my ankle hurts like a sumbitch, which it started doing today. The outside, especially along that tendon/muscle that connect the outside anklebone to your calf, has been achy and easily agitated all day long, even in the Darth Vader Boot of Protection. Tonight's post is gonna be short so I can go play with the Vicodin.

When I say "contractor", I often use that term interchangeably. Sometimes it just means the company that's doing the construction. Other times I mean one particular representative from the GC, or general contractor. Construction companies employ several people to see a project through, and this process is most often seen in large projects like, say, building or renovating a hospital. Norton Construction, the contractor on MHRC, has a few folks behind the scenes, like a VP or manager in charge of certain types of construction, and this VP/manager is often an architect's first contact when a project starts. Norton also has a team of estimators, who take my drawings and get pricing for the various systems. They can also do ballpark estimates on prices, based on recent completed or bid projects.

But when the work really starts on a large project, the "contractor" comes down to three people: the project manager (PM), the superintendent (the super), and the field engineer or project engineer (proj-eng*). The PM is someone with a fair amount of experience in construction, and this person is in charge of balancing work with budget. This guy's equivalent in my office is Howie. The PM deals a lot with money and financial issues related to the project, which gives the super the room to just get it built. This is just as how Howie handles costs and fees on my behalf and argues with the owner and the contractor about who pays for what so that I can just get questions answered and help get the damn thing built. It's a handy good cop/bad cop division of labor that's also efficient.

My equivalent on the contractor's side is, for the most part, the super. Though really, my job is sorta split between the proj-eng and the super. The super makes sure everything's getting built according to the drawings and specs, and he's the contact point for all the subcontractors on the site. He (I'm not being sexist here--I've never seen or heard of a female super, though I'm sure it's not impossible to have one) answers questions, makes sure construction is on schedule, looks ahead for possible problems and checks with the architect to solve these ahead of time. This part of the work bleeds over into the proj-eng's job. He or she (more proj-engs I've worked with here lately have been shes than hes) handles a lot of paperwork. A lot. There's a lot in construction, for sure. She issues and keeps track of questions to the architect and engineers from the field, shop drawings and product info from subcontractors, and changes to the documents. She will also sometimes help the PM track down pricing and be a go-between for the architect and a subcontractor.

All of these people come to the OAC meeting each week (or however often it happens). The architect spends a great deal of time on the phone and in person with the super and the proj-eng and not as much with the PM. On MHRC procedure suite, Phil is the PM, Billy Ray (whom y'all have met) is the super, and Zahara is the proj-eng. Just wanted to introduce them, as I'm sure I'll be talking about them a lot for the next few months.

*Sometimes a project engineer will say their title is "PE," but that is a misleading term. When a mechanical or electrical engineer has passed their licensure exams, they are alowed to use "P.E." after their names, which means "professional engineer." While a project engineer does good, hard work, they are not engineers as I think of them. And though they are called engineers, none of the aforementioned people drive trains, nor do they wear striped bib overalls and red handkerchiefs around their necks.

Friday, October 26, 2007

Quasi Detail of the Week: Fun with Asbestos

Even though I got several phone calls today from my contractor, it was quiet overall, and I got a fair amount of drawing and RFI-answering done, all while propping my foot up on my desk. Every little bit of elevation helps, it seems. It was quiet because, as I mentioned in an earlier post, my procedure suite project was shut down until Tuesday for asbestos abatement and removal.

Quick refresher for some: asbestos was long used as fireproofing on building elements (like beams and columns) as well as in finishes (like wall coverings, fabrics, and flooring products). Even in Roman times, asbestos was used in napkins because they could be burned clean (wish I could find the source on that). However, it was discovered in teh late-1970s/early-1980s that breathing asbestos fibers gave one a touch of the cancer, so asbestos had to be removed or at least sealed up wherever possible (a process called abatement). I recall doing a remodel job up in Fort Collins back when I started at Design Associates in 2000 in the art building at a small college. The project manager I was with wanted to look in the ceiling (we call that "popping a tile", as in popping a ceiling tile up out of its grid so as to have a look around), and the building manager nearly had a stroke. "If you pop a tile, I'll have to shut the building down--we have asbestos on our structure!" he gasped. Hence, until abatement occurred, no one could even do so much as replace a ceiling tile--just had to patch it up.

In the procedure suite at MHRC, the VCT (vinyl composition tile) was safe, but the adhesive used to attach the tile to the concrete slab has asbestos. We had originally planned to just cover the floor, tile, sealant and all, with the new flooring, but the slab was in such bad shape from demolition that we were going to have to bead-blast it (not sure what that entails), then pour a self-leveling topping over the slab, then lay our new flooring on that. The bead-blasting, which I imagine is a lot like sandblasting, would have made the asbestos fibers friable--that is, singular and crispy, able to be handled and breathed--so we had to shut the area down and have it abated.

Not all asbestos removal is this drastic. Sometimes, it's found in pipe insulation on old plumbing systems, and it can simply be removed while wearing some gloves, put in a bag, and picked up by the hazardous waste folks. That also happened on the demo of the procedure area, and it was handled nicely and quietly.

So, the abatement company, which charges handily for its services, will be working through the weekend (charging even more handily, I'm sure) to finish removal. Monday, the state health board comes in and looks everything over and approves it. After that, we can go back in and get going again. My contractor will then begin looking for ways to accelerate the construction schedule so that we can make up for lost time and finish when we said we'd finish.

More construction details later. Guy should be home from his business trip any moment now. I'll have my foot up, anxiously awaiting his arrival. Wonder if I should just go ahead and call Pizza Hut now?

Thursday, October 25, 2007

CrutchWatch '07: Hijinks With Howie

"Holy shit, what happened?!" Howie's eyes flew open when he saw me round the corner into the kitchen, crutchcrutchcrutching along with Ethel carrying my coffee/water mug. Howie, my prodigal boss for whom I've been unable to work for the past few months due to all my projects being on hold, had been out of the office for a few days and hadn't seen me in my new state of infirmity.

"Twisted my ankle jogging. Chipped the end off my fibula and got a bad sprain in my ankle." I balanced on my left leg while Ethel got me some water.

"Wow," replied Howie. "Can I see your crutches?"

"Sure," I said, and before I could utter another word, he'd flipped them upside-down, climbed up onto them with his feet on the handholds, and proceeded to stilt-walk around the kitchen on my crutches. Incredulous laughter bubbled up in the office as people began realizing what my straight-laced, perfectly-gelled-haired, tie-wearing boss was doing. Ethel couldn't contain her laughter, nor could I. She said, "Up until just now, he really intimidated me. I don't know if I can look at him the same way again!" I just shook my head. Howie's a straight-on guy, but sometimes, you just never know.

This afternoon, I saw the doc for a follow-up, which required an x-ray of my foot. We discovered a lot of bruising and swelling on my instep, leading the doc to believe that I might have had an actual foot break. (It also alternately fascinated me and grossed me out.) After an ungodly amount of waiting, it was revealed that it was just swelling, no breakage, and I would only be needing the "Darth Vader" walking cast, which velcros all around my foot and lower leg. I also have to come back in ten days for yet another follow-up to see how I'm progressing. I still can't really put any weight on it, so I still need the crutches, but I can better use it for balance now. On the upside, I got a prescription for Vicodin...finally. Now all I need is my copy of "Dark Side of the Moon" and my weekend will be complete.

Tuesday, October 23, 2007

Crutching with a vengeance

That was how Jacqueline described my quasi-perambulation around the office today. Evidently, I'm nearly as fast on crutches as I am on two feet. However, my armpits are so sore they feel like they should be blistered--the crutches say theyre' for folk 5'-2" to 5'-10", and I'm only 5'-0". So, ouch. At least the office is full of people who wanted to help me out today. Ethel followed me to the bathroom/kitchen twice today, and even Wanda carried some shop drawings up to the front desk for me. I hate having to get that kind of help all the time. It's really inefficient and annoying. Tomorrow I have to go walk around the procedure suite area with Billy Ray to figure our where to reroute a duct into the basement. yay. According to the flooring guy, the floor in there is the worst he's seen in ten years, and he needs to fill the pits and holes left in it (which remain from demoing the CMU walls and chunks of random slabs), but before he fills that in and then pours leveling compound on it, the abation experts have to come in and remove the old VCT tiles because the adhesive containes asbestos. We wanted to just pour the leveling compund over the old tiles, but in order to apply the compound, you have to bead-blast the slab, and in doing so it's gonna tear up the tiles and release the asbestos. Asbestos in the air, right next to the asthma clinic. And me trying to walk over this really uneven survace. Yippee-fuckin'-do.

Meanwhile, I'm convinced that we're saving entirely too many lives with smoke barrier walls. In a rated smoke barrier wall, you need a closer on every door. The closer is at the top of a door; it's a contraption that pulls the door shut once it's opened. My experience today has been that closers are set to shut waaaaaay too fast, usually they shut on me as I'm zipping through the door. Or, zipping as much as one can on crutches. We have an elevator in our building, but it's in a back hall, where we share it with the other half of our building (presently vacated). The elevator is in a rated enclosure, so I have to keep stumbling through doors with closers to get between floors. Hence, it's crutchcrutchcrutchcrutch to the other side of the office, fight the door open and get through, trundle upstairs or downstairs in the ancient elevator, then fight through the next door and crutchcrutchcrutchcrutch back across the office to go pee, check the large-format plotter, get anything done. Then repeat the laborious process back to my desk. I know that in a few months, I'll be back to normal, but fuck if I could handle this the rest of my days. The constant stumbling, leaning, taking forever to get anywhere or get anything done. If I could reach the bottle in the cabinet, I'd have a drink.